The middle of three new bridges built for the Port Lands redevelopment has just been opened to traffic.

looking north up cherry street through new yellow and white curvy bridge

The bridge may be open to traffic, but the area is still a construction zone!

Eventually Cherry Street will be realigned so that there is no jog in it at Lakeshore.    At this point in time, the south part of the realignment is closer to completion.  This is where the new bridge is.

Commissioners Street has been extended westward to join the new segment of Cherry Street.

 below: This is the east intersection of Commissioners and Cherry (looking east).  Yes, it’s a mess!  There are traffic signals even though only two of the four approaches are open.  If you are traveling south on Cherry, you have to turn right onto Commissioners.

cherry street and commissioners street intersection, canary diner restaurant, construction, port lands redevelopment

below: Same intersection, looking west.

intersection of Cherry and Commissioners street, construction, police watching over, trucks in intersection, new traffic signals

below: New part of Commissioners Street

construction along the west end of Commissioners street in the port lands, with the toronto skyline in the background

below: The west part of Commissioners ends here

dead end street, Commissioners street, west end, fence and no entry signs, traffic lights

below: If you stand in the same place as the above photo but turn to your right, this is the view that you see.  This is the new part of Cherry Street being realigned to match the section north of Lakeshore Blvd.  The new bridges over the Keating Channel are in place but there is still a lot to be done before this part of Cherry Street can be opened.

Glooking north where the new part part of Cherry Street is being built, new double bridge to go over the Keating channel as well as condos in Distillery District are in the background

below:  Looking south… It is the middle bridge that has been opened to traffic first.  It is located approximately where the T ‘n T grocery store used to be.  An interesting line of large boulders!

new Cherry Street bridge with its yellow curved lines, large rocks in the dirt in the foreground, construction still in progress

below: This is the view from the new bridge looking west.  The large white crane structure predates the construction.  The channel has always been here as it provides water/ship access to the Lafarge cement site on the south side of the waterway.  What is new is that the channel is being extended eastward to join the mouth of the Don River.

view from the Cherry Street bridge new bridge, towards Lake Ontario, Toronto skyline in the background, construction equipment in the foreground for the redevelopment of the Port Lands

below: Traveling northbound

a cement truck and a ttc bus on Cherry street on the new bridge

two cyclists pass over the new Cherry Street bridge in the bike lane

below: Looking east from the bridge.   Pinewood studios in the background on the right.

looking east from port lands yellow bridge, overlooking construction in port lands

below: Another view to the east but slightly more south.  This time Pinewood Studios is more to the left in the photo.   A pedestrian bridge is already built to span the new water channel that is under construction.

port lands redevelopment, noew pedestrian bridge over new water channel that is being created

temporary pole with pedestrian crossing light at an intersection in a construction zone, a cyclist is passing through, new port Lands bridge in the background

below: Looking north up Cherry Street towards the Distillery District.  The old, and now closed part, of the street is being torn up.  The new street and bridge are to the left in this photo.

port lands construction site, starting to tear up the old part of Cherry Street, distillery district condos in the background

port lands construction site, starting to tear up the old part of Cherry Street, distillery district condos in the background

big yellow machinery digging up the asphalt from an old road and placing it in a dump truck

a man in a red shirt walks two dogs on the sidewalk along Cherry street, towards construction and the new bridge, TTC bus in the oncoming lane of traffic

orange construction sign that says be prepared to stop, haul trucks entering and exiting, with construction, and a large dump truck beside and behind the sign

below: To the south, the lift bridge on Cherry Street is being refurbished but not replaced.  This part of Cherry Street is not being moved.

looking south at Cherry Street to lift bridge that is being refurbished

in the early morning sun, stairs in the sunlight beside a bridge, going down to the water, an old building and its reflections behind

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s