more changes, more demolition

From Leslie to Cherry, Commissioners Street runs through the middle of the Port Lands, or at least it used to. The re-making of the mouth of the Don River involves a new waterway that cuts Commissioners into two sections.  This blog post is a quick look at the east side.

Toronto blue and white street sign for Commissioners Road, also a sign for Port of Toronto

below: TTC streetcar leaving Leslie Barns at Leslie and Commissioners- celebrating 100 years.

TTC streetcar leaving Leslie Barns, sides are decorated with pictures commemorating 100 years of the TTC

below: There are a lot of cement mixers in the area!

cement plant on Commissioners Road, cement truck parked in front

cement concrete facility

below: Canada Post has a large presence in the area too.  A series of images of stamps featuring Canadian birds, such as this black-capped chickadee, decorate the exterior wall of one of their buildings.

picture of Canada Post  stamp with a chickadee on it

 

port a pottie by a wall holding back a pile of sand

below: Portlands Energy Center on the other side of the Shipping Channel.   This is natural gas powered electricity generating facility.  It also has a steam turbine generator that allows it to make electricity using steam from waste heat.

gas powered electric station on the shores of the Shipping Channel in the port lands, large white building with 2 tall smoke stacks

below:  Commissioners Street now ends at Saulter

end of Commissioners Road, chainlink fence, road taken up, Toronto skyline behind

below: The new bridge has been delivered and sits at the western end of Commissioners, on the other side of the gap.  Soon(?) that gap will be part of the new route of the Don River.

in the distance, new bridge for Commissioners Road, end of Commissioners Road, chainlink fence, road taken up, Toronto skyline behind

port lands construction with city skyline behind

below: Looking north on Saulter Street towards Villiers Street.  Metal beams from the Gardiner are being lowered to the ground.

looking north on Saulter street towards demolition work on the gardiner

below: New utility poles on Saulter, with another view of the Gardiner demolition.

new utility poles at a construction site, hydro poles

below: Saturday traffic on Villiers.  The Lakeshore is closed on the weekends to facilitate the dismantling of the Gardiner.  Yes, it does cause traffic issues and confusion!

construction zone along Villiers Street, concrete barricades separating car traffic from cyclists, blue fence around construction, demolition of the Gardiner Expressway, skyline in background

below: Looking north on Don Roadway from Villiers

looking north on Don Roadway from Villiers, demolition of Gardiner

very large crane on Don Roadway, Gardiner demolition

red and white danger due to sign, danger due to noise

below: Some of the concrete bents from the Gardiner still stand as does the curved elevated ramp from the Gardiner to the DVP.

motorcyclists wait for traffic light at intersection of Don Roadway and Villers, construction behind them, removal of eastern portion of the Gardiner Expressway

below: An abrupt end

ramp to Don Valley Parkway is still in place but the Gardiner is gone except for a couple of bents

below: Crane demolishing a concrete bent beside the Keating Channel.

demolition of the Gardiner, yellow crane, by Keating channel

below: An older photo from 2015 showing the Gardiner Expressway on the north shore of the Keating Channel with the Lakeshore below. The yellow crane in the image above is close to where the blue barge is in this picture (but on the shore side!).   The supports for the Gardiner over the mouth of the Don River are metal (the greenish coloured two on the right side of this photo), not concrete like the others.  These metal supports is at the right edge of the photo above.

from 2015, photo of Gardiner along the north shore of the Keating channel

photo taken in 2015

demolishing concrete bents under the Gardiner, catching debris in nets and on sliders that direct rubble to piles

below: When the steel beams are removed, they are first trimmed and cut in half.

men helping a crane to direct a girder down to the ground while another machine breaks another girder to get it ready to go in truck

below: They are then hauled away to another site where they are cut down even more.

truck taking away girders that have been removed

below: Standing in the middle of Lakeshore Blvd and looking west. Remains of the Gardiner.

taken from center of Lakeshore - Lakeshore looking west from Bouchette, middle of Gardiner demolition, road surface is missing but steel structure is still there

below: Side view, Lakeshore with remnants of the Gardiner rising up beside.  Soon to be gone.

side view, Lakeshore looking west from Bouchette, middle of Gardiner demolition, road surface is missing but steel structure is still there

cyclist rides on the sidewalk past construction site in Port Lands, Gardiner demolition

Comments
  1. icelandpenny says:

    What’s the overall intention of the re-working of the mouth of the Don? Is it to restore a more natural, more eco-beneficial contour?

    • Mary C says:

      I think so. Flood prevention is also a priority as they get ready to redevelop more of the Portlands. Also part of the Gardiner is coming down and Lakeshore is being re-routed.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s